“RasonConTrans” JVС performs all complex of works on the current contents and track repair by forces of permanent members of staff. During the period from December, 2017 to March, 2018 on the site Druzhby Bridge – Tumanggang – Radzhin works on bearing of a way in the plan and a profile were intensively performed that provides necessary smoothness of the course of the rolling stock, safe and uninterrupted train service. the Type of folding outlines of elements of the top structure of a way causes positive emotions and a feeling of reliability even at people of all criteria of their working order, far from deep understanding.
Works on adjustment of width of a track which parameters throughout the site are specified to the standards established in JSC "Russian Railways" were intensively conducted. The condition of a way on this indicator also is one of necessary components of traffic safety.
Change a rail with excess side wear in curve sites of a way is executed, the total made 62 pieces. Drainage constructions are continued to prepare for the admission of spring and storm waters. Cleaning of trays, ditches, mountain ditches, courses of water throughput pipes and bridges is carried out. In necessary volume the ballast prism is filled up with crushed stone, the weakened sites of a road bed are supported with rocky soil.
The question of the organization of transportations on the site Radzhin is in the short term considered – Namyan the purpose of which is transit of freight through the territory of the DPRK in the People's Republic of China through railway boundary transition Namyan – Tumen as Makhalino's transition – Hunchun of Hasansky district of Primorsky Krai owing to low capacity is not able to satisfy the increased needs of consignors and consignees. In this regard the plan for improvement of the top building and track repair on the site Mulgol – Namyan during the spring and summer period is formed.